US 64/87 Ports-to-Plains Feasibility Study (NM)

    • “The New Mexico Department of Transportation is in the process of finalizing a contract with Parametrix to prepare the Phase I-A/B report for the US 87/US 64 sections of the Ports-to-Plains Corridor (Proposed I-27). The study will kick off in Spring 2026 and is expected to take 18 months to complete. The team is enthusiastic about partnering with the P2P Alliance and engaging stakeholders throughout the corridor.” — From Parametrix
    • Technical Description of Project: This is a study regarding the Future Interstate Highway along the Ports-to-Plains Corridor (US 87/64) between the New Mexico-Texas state border and Raton. The Future Interstate Highway has potential to provide positive economic development impacts for northeast New Mexico.
Scroll to Top